r defect: Who may repair; manner for performing repairs; deadline for repair; extension of deadline; written statement of repairs performed.
1. If the response provided pursuant to NRS 40.6472 includes an election to repair the constructional defect:
(a) The repairs may be performed by the contractor, subcontractor, supplier or design professional, if he is properly licensed, bonded and insured to perform the repairs and, if he is not, the repairs may be performed by another person who meets those qualifications.
(b) The repairs must be performed:
(1) On reasonable dates and at reasonable times agreed to in advance with the claimant;
(2) In compliance with any applicable building code and in a good and workmanlike manner in accordance with the generally accepted standard of care in the industry for that type of repair; and
(3) In a manner which will not increase the cost of maintaining the residence or appurtenance than otherwise would have been required if the residence or appurtenance had been constructed without the constructional defect, unless the contractor and the claimant agree in writing that the contractor will compensate the claimant for the increased cost incurred as a result of the repair.
(c) Any part of the residence or appurtenance that is not defective but which must be removed to correct the constructional defect must be replaced.
(d) The contractor, subcontractor, supplier or design professional shall prevent, remove and indemnify the claimant against any mechanics’ liens and materialmen’s liens.
2. Unless the claimant and the contractor, subcontractor, supplier or design professional agree to extend the time for repairs, the repairs must be completed:
(a) If the notice was sent pursuant to subsection 4 of NRS 40.645 and there are four or fewer owners named in the notice, for the named owners, not later than 105 days after the date on which the contractor received the notice.
(b) If the notice was sent pursuant to subsection 4 of NRS 40.645 and there are five or more owners named in the notice, for the named owners, not later than 150 days after the date on which the contractor received the notice.
(c) If the notice was sent pursuant to subsection 4 of NRS 40.645, not later than 105 days after the date on which the contractor provides a disclosure of the notice to the unnamed owners to whom the notice applies pursuant to NRS 40.6452.
(d) If the notice was not sent pursuant to subsection 4 of NRS 40.645:
(1) Not later than 105 days after the date on which the notice of the constructional defect was received by the contractor, subcontractor, supplier or design professional if the notice of a constructional defect was received from four or fewer owners; or
(2) Not later than 150 days after the date on which the notice of the constructional defect was received by the contractor, subcontractor, supplier or design professional if the notice was received from five or more owners or from a representative of a homeowners’ association.
3. If repairs reasonably cannot be completed within the time set forth in subsection 2, the claimant and the contractor, subcontractor, supplier or design professional shall agree to a reasonable time within which to complete the repair. If the claimant and contractor, subcontractor, supplier or design professional cannot agree on such a time, any of them may petition the court to establish a reasonable time for completing the repair.
4. Any election to repair made pursuant to NRS 40.6472 may not be made conditional upon a release of liability.
5. Not later than 30 days after the repairs are completed, the contractor, subcontractor, supplier or design professional who repaired or caused the repair of a constructional defect shall provide the claimant with a written statement describing the nature and extent of the repair, the method used to repair the constructional defect and the extent of any materials or parts that were replaced during the repair.
(Added to NRS by 2003, 2037)
NRS 40.649 Notice of defect may be presented to insurer; duties of insurer.
1. If a contractor, subcontractor, supplier or design professional receives written notice of a constructional defect, the contractor, subcontractor, supplier or design professional may present the claim to an insurer which has issued a policy of insurance that covers all or any portion of the business of the contractor, subcontractor, supplier or design professional.
2. If the contractor, subcontractor, supplier or design professional presents the claim to the insurer pursuant to this section, the insurer:
(a) Must treat the claim as if a civil action has been brought against the contractor, subcontractor, supplier or design professional; and
(b) Must provide coverage to the extent available under the policy of insurance as if a civil action has been brought against the contractor, subcontractor, supplier or design professional.
3. A contractor, subcontractor, supplier or design professional is not required to present a claim to the insurer pursuant to this section, and the failure to present such a claim to the insurer does not relieve the insurer of any duty under the policy of insurance to the contractor, subcontractor, supplier or design professional.
(Added to NRS by 2003, 2040)
NRS 40.650 Effect of rejecting reasonable offer of settlement; effect of failing to take certain actions concerning defect; effect of coverage available under homeowner’s warranty.
1. If a claimant unreasonably rejects a reasonable written offer of settlement made as part of a response pursuant to paragraph (b) of subsection 2 of NRS 40.6472 and thereafter commences an action governed by NRS 40.600 to 40.695, inclusive, the court in which the action is commenced may:
(a) Deny the claimant’s attorney’s fees and costs; and
(b) Award attorney’s fees and costs to the contractor.
Any sums paid under a homeowner’s warranty, other than sums paid in satisfaction of claims that are collateral to any coverage issued to or by the contractor, must be deducted from any recovery.
2. If a contractor, subcontractor, supplier or design professional fails to:
(a) Comply with the provisions of NRS 40.6472;
(b) Make an offer of settlement;
(c) Make a good faith response to the claim asserting no liability;
(d) Agree to a mediator or accept the appointment of a mediator pursuant to NRS 40.680; or
(e) Participate in mediation,
the limitations on damages and defenses to liability provided in NRS 40.600 to 40.695, inclusive, do not apply and the claimant may commence an action or amend a complaint to add a cause of action for a constructional defect without satisfying any other requirement of NRS 40.600 to 40.695, inclusive.
3. If a residence or appurtenance that is the subject of the claim is covered by a homeowner’s warranty that is purchased by or on behalf of a claimant pursuant to NRS 690B.100 to 690B.180, inclusive, a claimant shall diligently pursue a claim under the contract. If coverage under a homeowner’s warranty is denied by an insurer in bad faith, the homeowner and the contractor, subcontractor, supplier or design professional have a right of action for the sums that would have been paid if coverage had been provided, plus reasonable attorney’s fees and costs.
4. Nothing in this section prohibits an offer of judgment pursuant to Rule 68 of the Nevada Rules of Civil Procedure or NRS 17.115 if the offer of judgment includes all damages to which the claimant is entitled pursuant to NRS 40.655.
(Added to NRS by 1995, 2541; A 1997, 2719; 1999, 1442; 2003, 2044)
NRS 40.655 Limitation on recovery.
1. Except as otherwise provided in NRS 40.650, in a claim governed by NRS 40.600 to 40.695, inclusive, the claimant may recover only the following damages to the extent pr